
Realising the predominant role of Infrastructure in ensuring consistency and reliability we have always upgraded our facilities by incorporating the latest technologies and by replacing outdated equipment with state of the art plant and machinery thus ensuring the consistent and superior quality of our products.
Our state of the art Tape Line is equipped with Beta-Ray Online Non Contact Gauging System and closed loop feedback control, minimising variations and ensuring a high degree of conformity to specifications.
Advanced process control is achieved by use of specially designed heat exchangers, multi-port automatic mixing valves and constant temperature water or oil sources. The water and oil being specially treated and supplied so as to retain the necessary thermal, chemical and flow properties, thus maintaining uniformity in Product Quality.
Our weaving equipment comprises of 6, 8, and 10 shuttles circular weaving looms of the latest design incorporating AC Invertor Drives to achieve fine and consistent control of weave quality.
We have recently augmented our coating and laminating infrastructure to meet the global demands for wide width extrusion coated and laminated substrates. Since the commissioning of a 4.0 meter extrusion lamination plant incorporating the latest technology available we are in a position to laminate 800 metric tons of PE/PP fabric per month. This includes an online Corona Surface Treatment Station to ensure good surface adhesion properties.
We have also commissioned a 4.0 meter multi functional Slitter-Rewinder, strengthening our finishing operations and enabling us to meet the future expectations of our customers worldwide.
To provide more holistic services we shall soon be commissioning a 4.0 meter two colour flexographic printing line during the third quarter of 2007.
The Quality Assurance system utilises Statistical Quality Control Techniques and is supported by the latest digital Testing Equipment to monitor and correct even the slightest deviations thus assuring our customers of value for money.
Our ambitions fuelled by global acceptance of our products and customer goodwill, together with the imperative of surpassing global levels of efficiency impelled us to set up a world class state of the art manufacturing facility on 25000 square meters, enabling economies of operation and resulting in more efficiency. With the commissioning of this facility early in 2008 we shall be in a position to manufacture 1000 metric tons of PE/PP woven fabric per month, at internationally competitive standards.